Planning Permit and Certificate of Final Approval in Cyprus: Validity, Checks and What Each Document Unlocks
A new building in Cyprus needs three approvals in order: a planning permit, a building permit (with a division permit for a block of apartments) and, at the end, a certificate of approval, which the trade calls final approval. A planning permit lasts 3 years unless it states another period, and a building permit lasts 3 years with renewals of 2 years and then 1 year at a time. Section 10 of the Streets and Buildings Regulation Law (Cap. 96) forbids anyone to possess or use a building until the certificate exists: the permit holder must apply within 21 days of completion and the supervising engineer must report within 30 days. The Department of Lands and Surveys registers no title deed for a new unit without the engineer's completion certificate and the building authority's certificate, so the certificate gates both the keys and the ownership. In the worked example below, a €300,000 apartment in a 24-unit block carries €1,244 of published Land Registry division fees, about €52 per unit, and a 5% retention of €15,000 held until the title deed is issued (sources read on 16 November 2026).
Planning permit, building permit and certificate of approval: the three documents in order
Each approval answers a different question. The planning permit decides whether the development fits the zone and the Development Plan. The building permit decides whether the construction drawings and engineering meet the Streets and Buildings Regulation Law. The certificate of approval decides whether the finished building matches the permit, and it is the document that makes use of the building lawful and lets the Land Registry create a separate title deed for each unit.
| Document | Issued by | Legal basis | What it covers | Application form |
|---|---|---|---|---|
| Planning permit | The competent Town Planning Authority named by the Delegation of Powers Decree | Town Planning and Spatial Planning Law 90/1972, sections 21 to 28 | Whether the development is allowed on the property, with conditions and a validity period | EA15 (building development or change of use), EA2 (land division) |
| Building permit | The District Local Government Organisation of the district | Streets and Buildings Regulation Law, Cap. 96, section 3 | Permission to build, alter, demolish or change the approved use of a building | A1 |
| Division permit | The same body, normally together with the building permit | Cap. 96, section 3(1A) | Splits the building into self-contained units and fixes the common areas and exclusive-use areas | A12 (building permit with a division permit), A2 |
| Certificate of approval | The same body, with a copy sent to the District Lands Officer | Cap. 96, section 10 | The completed works follow the permit; the building may be used | A9 |
The statute calls the last document the certificate of approval (in Greek, πιστοποιητικό έγκρισης), and IPPODAMOS, the electronic licensing system, lists it as form A9, "Application for Certificate of Approval". The phrase "final approval" is the trade's shorthand for the same certificate; it does not appear in Cap. 96, in the Town Planning Law or in the Department of Lands and Surveys leaflets read for this guide. A second document has a similar name. The completion certificate in the Land Registry's wording is the supervising engineer's certificate, which is a separate paper from the building authority's certificate and is explained below.
Who issues a planning permit and a building permit in Cyprus since July 2024
Since 1 July 2024 the authority to issue building permits belongs to the District Local Government Organisations (DLGOs) of Nicosia, Limassol, Pafos, Larnaca and Famagusta. Before that date municipalities and the district administration offices issued them. The Statistical Service states the transfer in its building permit releases, and the Point of Single Contact for business, run by the Ministry of Energy, Commerce and Industry, says a building permit follows a town planning permit and comes from the DLGO of the district where the building stands. The application goes in through IPPODAMOS, filed by the owner through the project designer whom the owner authorises.
A planning application also goes through IPPODAMOS, filed by the owner or an authorised representative with the competent Town Planning Authority, which the Delegation of Powers Decree names. The documents include architectural and site plans signed by the designer, a signature form, the consent of the mortgage lender if the property is mortgaged, an external boundary certificate request for unregistered plots and the replies of the departments consulted. The Point of Single Contact adds that in many cases the Planning Authority has no discretion and must refuse a permit when the basic provisions of the Development Plan are not met. For a development listed in the General and Special Development Decrees a planning permit is deemed granted, yet a building permit is still required.
The Ministry of Interior's Town Planning and Housing Department runs the IPPODAMOS service desk. Its gov.cy service page lists the forms A1 (building permit), A2 (separation of land, buildings or road construction), A5 (demolition), A6 (copy of a licence), A7 (renewal), A9 (certificate of approval) and A12 (building permit with a possible division permit), and gives the desk's address at Kinyra 5-6 in Nicosia, the telephone +357 22409500 and the email ippodamos@moi.gov.cy. The planning decision time is not fixed in the pages read: if the authority cannot decide within three months because issues remain open, it may ask the applicant to agree to an extension. The Statistical Service also reported that in the first months after the July 2024 change the system had technical and procedural weaknesses and delays.
How long a planning permit and a building permit stay valid
Validity matters for a buyer because building without a building permit in force is a breach under section 21 of Cap. 96, and a permit that lapses before completion needs a renewal on which the authority may set new terms. The two permits follow separate rules.
| Permit | Standard validity | Extension or renewal | Outer limit |
|---|---|---|---|
| Planning permit | 3 years from the notification of the grant, unless a condition in the permit sets another period (section 28(2) of the Town Planning Law) | One or more extensions, on request or by the authority; if the authority does not answer a request within 3 months the extension is deemed approved for 1 year, where the conditions of section 28(3) apply | 8 years in total for a single residential unit or a change of use; 12 years for other building development or a plot development under 100 units; 18 years for 100 units or more (permits granted before the 2011 amending law: 10, 17, 23 and 25 years, the 25 years for 200 units or more) |
| Preliminary opinion on a planning question (form EA8) | Binding on the Planning Authority for 1 year | A new request after that | Not applicable |
| Building permit | 3 years from the date of issue (section 5(1) of Cap. 96); the authority may tie it to the validity of the planning permit | Renewal for 2 years from the end of the original validity, then further renewals of 1 year, only if the works have started, are substantial and are actively under way when the permit expires; if a planning permit exists, the renewal follows it | No fixed number of renewals in the text; the authority may change the conditions of the unexecuted part on renewal |
Section 28(1) of the Town Planning Law adds a point for plot buyers: a planning permit acts for the benefit of the property, which means it stays with the land when the owner sells. The building authority keeps a power that outlives the permit too. After a building permit expires, section 10(2) of Cap. 96 lets the authority visit the site and enforce the occupation rules if the building is in use without a certificate.
Certificate of approval, final approval and completion certificate: what each name means
| What you hear | Official meaning | Issued by | Where it is defined |
|---|---|---|---|
| Final approval, certificate of final approval, certificate of approval | The building authority's certificate that the works follow the permit (πιστοποιητικό έγκρισης) | The DLGO, with a copy to the District Lands Officer | Cap. 96, section 10; IPPODAMOS form A9 |
| Completion certificate, certificate of completion of works | The supervising engineer's certificate that the work is complete according to the permit, or the stage reached and the points that differ from the permit | The supervising engineer | Cap. 96, section 10(3); Land Registry leaflet |
| Certificate for the division permit | The certificate of approval, a certificate of approval with notes or a certificate of unauthorised works, issued for the division permit | The DLGO | Land Registry horizontal division page |
| Title deed | The certificate of registration of the unit at the Land Registry | The Department of Lands and Surveys | Land Registry leaflet |
The statutory sequence runs as follows. When the work is complete, the permit holder has up to 21 days to notify the authority and apply for the certificate, and must tell the supervising engineer the date of completion. The supervising engineer has 30 days from completion, from the completion of a large part of the work, or from the start of use before everything is finished, to submit a certificate to the authority. The authority may ask the engineer for a full report. It issues the certificate when satisfied that the work follows the permit. Section 10(5) lets the permit holder, any person with an interest in the building or in the division, or the authority acting on its own apply for the certificate, and the certificate makes the works it covers lawful whether or not a planning or building permit remains in force. Section 10(6) lets the authority certify part of the work, which is how a developer can obtain approval block by block. A copy goes to the District Lands Officer under section 10(7).
Section 10(5) also covers money. The authority may require the fees from the person who applies, and if payment is refused it informs the Director of Lands and Surveys so that the dues are paid before a unit is transferred and registered to the owner. A buyer can therefore meet an unpaid authority fee at the moment of registration, and the contract should say who bears it. No official page read gives a time limit for the authority to issue the certificate after the application; the statute sets deadlines only for the permit holder and the engineer.
Certificate of approval with notes and certificate of unauthorised works: what they do to a title deed
Two variants record deviations from the permit. Section 10B allows a certificate of approval with notes for works of minor importance that differ from the permit. The notes list the irregular parts and the provision breached, and the authority's certificate becomes a request to the District Lands Officer to enter a note of irregularity on the updated title. Section 10C allows a certificate of unauthorised works for works of material importance, for example building outside the property limits or affecting neighbours' amenities or public safety. The District Lands Officer then enters a prohibition on voluntary transfer and charging of the property or unit.
The prohibition has listed exceptions: involuntary transfers and charges, inheritance, gifts to a spouse, children or a person up to the third degree of kinship, and a transfer or mortgage in favour of a licensed credit institution or a credit-acquiring company in a restructuring. A sale by the owner's free will to an unrelated buyer is a voluntary transfer under section 10C(3), so it falls under the prohibition. The Land Registry's leaflet tells buyers to check whether the certificate comes with or without notes or other restrictions. The effect on title and the Land Registry's division file are covered in our guide to buying property without title deeds.
What happens when a development has no certificate of final approval
| Consequence | What the official text says | Source |
|---|---|---|
| No title deed | A new unit under construction cannot be registered. Registration needs a completion-of-works certificate from the supervising engineer and a certificate from the competent building authority. If the building is finished and no deed exists, the buyer should find out why | Department of Lands and Surveys leaflet PIO 179/2022 |
| Occupation is unlawful | No person may possess or use a building, or act so that another does, until the certificate is issued, even where a building permit exists | Cap. 96, section 10(1) |
| Criminal liability | Possessing or using a building before the certificate is an offence: first conviction up to 1 year in prison, a fine up to €10,000 or both; second conviction up to 2 years, €20,000 or both. The court may order use to stop within a period of at most 2 months unless the certificate or permit is obtained meanwhile | Cap. 96, section 20(1)(c) and (3)(b) |
| Administrative notice and fine | For occupation without a certificate, and for failing to apply within 21 days, the authority serves a notice with a deadline; if the owner does not comply the administrative fine can reach €5,000. The occupation limb has applied since 18 March 2021 | Cap. 96, section 21 |
| No division of the building | The Land Registry accepts a division application only with a certificate from the competent authority for the division permit (approval, approval with notes or unauthorised works) | Land Registry horizontal division page |
| Payments | The Land Registry advises against paying the full purchase price before the title deed is transferred to the buyer's name | Department of Lands and Surveys leaflet PIO 179/2022 |
Two consequences that readers often expect have no confirmation on an official page. For a mortgage, the Land Registry says a unit under construction cannot be registered, and our reading is that a lender therefore cannot register a charge on the unit before the division and the deed exist; no official page read describes lender conditions for a new-build purchase, and each lender sets its own. For electricity and water, the Cyprus Mail published a guest column by a Cypriot lawyer on 4 November 2026 about finished homes waiting for a grid connection. It describes the Electricity Authority issuing terms once a building permit exists and inspecting before connection, and it does not mention the certificate of approval. The Electricity Authority's own site was under maintenance when this guide was prepared, so no EAC or water board page confirms whether the certificate is a condition of a permanent supply. Ask the developer which connection stage each utility has reached and put the date in the contract.
From certificate of approval to title deed: the Land Registry division, its conditions and fees
The certificate is the entry ticket to the Land Registry procedure, and the procedure then takes a separate period. A new apartment block is registered as one property, often under the developer's mortgage, until the registered owner applies for horizontal division, which creates a title deed for each unit. Since 2 January 2024 the Land Registry accepts the application only when three conditions are met at filing: the certificate from the competent authority for the division permit, a certificate of demarcation, and the cadastral field survey by a private surveyor. The file also needs the building permits, any planning permit, the mortgagees' consents to move each mortgage onto the new units (forms DE 223 and DE 225) and the list of new plots with the counterclaims under the sale contracts (form DE 250). Where the division permit differs from the sale contracts, the parties sign a supplementary agreement or the deed is issued with a note to that effect. Our guide on buying without title deeds lists the blockers; this page keeps to the fees and the time.
| Land Registry fee for horizontal division | Amount |
|---|---|
| Local enquiry | €20.00 |
| Each plot arisen | €10.00 |
| Title deed, per owner | €5.00 |
| Plans of each new unit | €6.00 |
| Cadastral field survey work, each new unit | €30.00 |
The page does not say who pays these fees, whether the €30 goes to the Land Registry or to the private surveyor, or whether the surveyor's own charges come on top, so the sale contract should state who bears them. For time, the only official estimate read is the Department's Citizen's Charter published in 2011, which puts the division and registration of jointly owned buildings at 12 to 18 months and says the period varies with each case, the volume of work and the staff available. The 2022 buyer leaflet and the current division page give no period, and no current official figure was found.
Planning permit and building permit fees: what is published and who pays
| Fee | Where it is set | Amount published | Who pays |
|---|---|---|---|
| Planning application | Town and Spatial Planning (Fees) Regulations and the amending regulations; the Receiving Officer calculates it after the completeness check; a web calculator is linked from the Point of Single Contact page | No flat amount; it depends on the development, so none is quoted here | The applicant, electronically; refunds only in the cases of regulation 3(2) |
| Building permit | Fee regulations under Cap. 96 | No amount read. The Cabinet approved amending regulations, reported on 28 October 2026, that remove the three geographic zones and the graduated charges on building area and plot division; they go to the House for approval | The applicant |
| Certificate of approval | Cap. 96, section 10(5) | The authority may require the fees from the person applying; no amount was found on an official page | The person applying; unpaid fees are collected before registration of a unit |
| Land Registry division | Department of Lands and Surveys page | €20 + €10 + €5 + €6 + €30 as in the table above | Stated by the sale contract |
A buyer of an off-plan unit usually pays none of these to the authorities directly, and the sale contract decides who bears them. A buyer of a plot who builds a home becomes the applicant for the planning permit, the building permit and the certificate of approval, and our guide to buying land and building a villa shows the plot-side costs. VAT and the transfer fee on the purchase itself are in Cyprus property VAT explained.
How to verify a planning permit and certificate of approval before you sign
- Ask for the documents by number and date: the planning permit with its conditions, the building permit, the division permit and every amending permit. The Land Registry's leaflet asks buyers of a unit under construction to confirm that these exist.
- Compute the validity dates from section 28 of the Town Planning Law and section 5 of Cap. 96 (see the table above) and ask for the extension or renewal decision if the original period has passed.
- Confirm the file with the issuing body: the DLGO of the district for the building permit and the certificate, and the Town Planning Authority named on the planning permit. IPPODAMOS offers form A6 for a copy of a licence and form EA7 for a copy of a planning registration. The pages read say that applications come from the owner or an authorised representative, and no official page says whether the public can check the status of a permit online, so ask the developer to request the copies or sign an authorisation for your lawyer.
- Order a search certificate from the Land Registry for the plot and the unit. It lists mortgages, deposited sale contracts and prohibitions, and a note of irregularity or a prohibition under sections 10B and 10C appears on the title.
- Read which kind of certificate the building holds: plain, with notes or of unauthorised works, and read the notes themselves.
- Find the planning zone and ask the planning authority whether a development plan, for example a new road, affects the property, as the Land Registry's leaflet advises.
- For a plot, ask whether a planning permit is needed (form EA9) and request a preliminary opinion (form EA8), which binds the authority for one year.
- Write the dates into the contract: the time frame for completion, the permits and the certificate of registration, and the consequences for the seller if the dates slip. These are the questions the Land Registry's leaflet lists for a unit under construction.
Our guides on how to vet a Cyprus developer and choosing a property lawyer cover who does the checking, and snagging a new-build covers the inspection at handover.
Planning permit and certificate of approval checklist: documents, issuers and timing
| Document | Issued by | What it proves | When you need it |
|---|---|---|---|
| Planning permit with conditions | Town Planning Authority | The development is allowed on the property; validity period | Before reserving or signing |
| Planning permit extension decision, if the permit is older than 3 years | Town Planning Authority | The permit is still in force | Before signing |
| Building permit and amending permits | DLGO of the district | The works are permitted and the permit is in force | Before signing, and again before each construction-linked payment |
| Division permit with approved plans | DLGO of the district | The unit exists in the plans with its share of common areas and exclusive-use areas | Before signing |
| Search certificate | Land Registry (District Lands Office) | Owner, mortgages, deposited contracts, prohibitions | Within 5 working days of signing, with the contract |
| Proof that the certificate was applied for (form A9) | Permit holder to the DLGO | The 21-day duty was met | At completion |
| Supervising engineer's completion certificate | Supervising engineer | The work is complete as permitted, or the stage and deviations | At completion, within 30 days |
| Certificate of approval (plain, with notes or unauthorised works) | DLGO, copy to the District Lands Officer | The works are lawful and the building may be used | Before taking keys and before the final payment |
| Mortgagees' consents (forms DE 223 and DE 225) | The developer's lender | The mortgage moves onto the new units | With the division application |
| Division application accepted, fees paid (form DE 248) | Land Registry (District Lands Office) | The title deed procedure has started | After the certificate of approval |
| Title deed (certificate of registration) | Land Registry | Ownership of the unit | At transfer, before the last retention is released |
Worked example: an off-plan apartment and the document that gates each step
Every date and share below is an assumption chosen to show the order. The payment schedule follows the 25% and 15% steps used in our guide to how deposits and instalments are protected off-plan, with the last 30% split into 25% at handover and a 5% retention. Cyprus law links the certificate to occupation and registration; it links no payment to any document, so payment gates exist only if the contract writes them.
- Assumption: a 2-bedroom apartment at €300,000 plus VAT in a 24-apartment block with a single owner, the developer.
- Assumption: the planning permit was notified on 10 January 2025 with no special period, and a combined building and division permit (form A12) was issued on 14 July 2025.
- Assumption: the contract is signed on 2 March 2026, and construction finishes on 30 June 2027.
- Assumption: the authority issues the certificate on 15 October 2027, which is an invented date because no official period exists.
- Assumption: each of the 24 units counts as a plot arisen for the Land Registry fee.
Validity first. The planning permit runs 3 years from 10 January 2025 to 10 January 2028, and the building permit 3 years from 14 July 2025 to 14 July 2028. Completion on 30 June 2027 falls 380 days before the building permit would lapse (30 June 2027 to 30 June 2028 is 366 days because 2028 is a leap year, plus 14 days to 14 July 2028). A delay past 14 July 2028 would need the 2-year renewal, available because the works would be active, and would reach 14 July 2030.
Deadlines at completion. The permit holder must apply for the certificate within 21 days of 30 June 2027, which is by 21 July 2027, and the supervising engineer must submit the completion certificate within 30 days, which is by 30 July 2027. The assumed issue on 15 October 2027 comes 107 days after completion (31 days of July, 31 of August, 30 of September and 15 of October: 31 + 31 + 30 + 15 = 107).
Money. The schedule is 25% at signing (€75,000), three stage payments of 15% each (3 × €45,000 = €135,000), 25% at handover (€75,000) and a 5% retention (€15,000): €75,000 + €135,000 + €75,000 + €15,000 = €300,000, each instalment with VAT added. The handover instalment is the one the contract ties to the certificate of approval, so the buyer neither takes the keys nor pays €75,000 before 15 October 2027. The €15,000 retention follows the Land Registry's advice not to pay the full price before the deed is in the buyer's name.
Land Registry fees. The division application in November 2027 costs €20 for the local enquiry, 24 × €10 = €240 for the plots, 24 × €5 = €120 for the title deeds, 24 × €6 = €144 for the plans and 24 × €30 = €720 for the field survey work, so €20 + €240 + €120 + €144 + €720 = €1,244. The per-unit part is €10 + €5 + €6 + €30 = €51, and spreading the €20 over 24 units adds €0.83, so about €52 per unit. Under the 2011 Citizen's Charter estimate of 12 to 18 months, an application filed on 1 November 2027 would reach registration between 1 November 2028 and 1 May 2029, which is how long the €15,000 retention could stay with the buyer; the real period may differ.
| Date (assumed) | Milestone | Document that must exist | Buyer's step and payment |
|---|---|---|---|
| 10 January 2025 | Planning permit notified | Planning permit, valid to 10 January 2028 | Check before signing |
| 14 July 2025 | Building and division permit issued (A12) | Building permit and division permit, valid to 14 July 2028 | Check before signing |
| 2 March 2026 | Contract signed | Both permits in force, search certificate dated within 5 working days | Pay €75,000 (25%) plus VAT |
| By 2 September 2026 | Contract deposited at the Land Registry | Contract signed by all parties | Deposit within 6 months of signing |
| 2026 to 2027 | Frame, roof, fit-out | Building permit still in force | Pay €45,000 each (15%) plus VAT, when the certifier confirms the stage |
| 30 June 2027 | Works complete | Supervising engineer's completion certificate by 30 July 2027; application A9 by 21 July 2027 | Ask for copies of both |
| 15 October 2027 | Certificate of approval issued | Certificate of approval (plain, with notes or of unauthorised works) | Read the type; then take the keys and pay €75,000 (25%) plus VAT |
| 1 November 2027 | Division application filed | Certificate for the division permit, demarcation certificate, mortgagee consents | Land Registry fees €1,244 for the block, paid under the contract |
| Between 1 November 2028 and 1 May 2029 (2011 estimate) | Title deed issued and transferred | Title deed in the buyer's name | Pay the €15,000 retention (5%) plus VAT |
The same table shows where a purchase can stall. If the certificate comes with notes, the deed carries a note of irregularity; if it is a certificate of unauthorised works, the prohibition on voluntary transfer applies to the unit and the buyer cannot sell it to an unrelated buyer until it is lifted. Both cases are better discovered before the €75,000 handover instalment than after. The planning and legal side of the contract itself is in Cyprus property law for foreign buyers.
Checking the planning permit on a plot: a dated example
A plot buyer is buying a permit as well as land, so the planning permit date decides the value. Assume the seller shows a planning permit for a single house, notified on 1 September 2023, with no special period in its conditions. The default is 3 years, so it ran to 1 September 2026. On 16 November 2026 it is 76 days past that date (30 days to 1 October, 31 to 1 November and 15 to 16 November give 76), which means the buyer needs the extension decision before signing. If an extension was granted, the single-house cap of 8 years means the permit can run no later than 1 September 2031. If the seller applied for an extension and the authority has stayed silent for 3 months, section 28(3) treats the extension as approved for 1 year when its conditions apply, and the buyer should ask for written confirmation of the date from the authority.
Because the permit acts for the benefit of the property, it passes with the land. The building permit follows separately: a new one lasts 3 years from its issue date. For buildability questions on rural plots, including what the planning authority allows outside village boundaries, see our guides to buying land and building a villa and buying agricultural land or a farm. Projects that are completed and certified are easier to check than land with a permit history, and the off-plan properties in Cyprus page lists new developments that you can match against the checklist above.
Planning permit and certificate of approval: questions buyers ask
New-build projects in Limassol, Paphos and Larnaca to check against this list
ApartmentZoia
Limassol · Polemidia
Apartment · PenthouseGAIA Residences
Limassol · Potamos Germasogeias
Apartment · ShopThalassa Residences 2
Limassol · City centre
Apartment · PenthouseKeys
Limassol · Panthea
Studio · ApartmentEden Golf
Paphos · Geroskipou
Apartment · PenthouseBronte
Paphos · Kato Paphos
ApartmentCarisa Melora Park
Larnaca · Livadia
ApartmentPlus 75
Larnaca · Kiti
Three years from the notification of the grant, unless a condition in the permit sets another period (section 28(2) of the Town Planning Law). Extensions are possible, with outer limits of 8 years for a single residential unit, 12 years for other building development or a plot development under 100 units, and 18 years for 100 units or more.
It is valid for 3 years, to 14 July 2028. If the works have started and are active at expiry, a renewal of 2 years is possible, which would reach 14 July 2030, and then further renewals of 1 year. The authority may change the conditions of the unexecuted part when it renews.
Within 21 days of completing the work (section 10(2) of Cap. 96), and the supervising engineer must report within 30 days. For completion on 30 June 2027 that means 21 July 2027 and 30 July 2027. Failing to apply is an offence under section 20(1)(b) and can bring an administrative notice and a fine of up to €5,000 under section 21.
No. Section 10(1) forbids anyone to possess or use the building until the certificate exists. Section 20(1)(c) makes it an offence, with up to 1 year in prison, a fine of up to €10,000 or both on a first conviction, and the court can order use to stop within at most 2 months.
Under the fee list on the horizontal division page, €20 for the local enquiry plus €51 per unit (€10 plot, €5 title deed, €6 plans, €30 field survey work): 20 + 24 × 51 = €1,244 for the block, about €52 per unit, if each unit counts as a plot arisen and the developer is the only owner. The page does not say who pays.
No current figure was found. The Department's Citizen's Charter of 2011 estimated 12 to 18 months for dividing and registering jointly owned buildings and said it varies. The 2022 buyer leaflet and the current division page state no period.
No. It puts a note of irregularity on the title and lists the irregular parts. A certificate of unauthorised works is the one that places a prohibition on voluntary transfer and charging, with exceptions for inheritance, gifts to close relatives and transfers or mortgages in favour of a licensed credit institution.
Since 1 July 2024 the District Local Government Organisations issue both, through the IPPODAMOS system; the certificate is form A9. Before that date municipalities and district administration offices did so. The Town Planning and Housing Department runs the IPPODAMOS desk.
Sources, all read on 16 November 2026. CyLaw consolidated texts, Cyprus Bar Association: Streets and Buildings Regulation Law, Cap. 96 (sections 3, 5, 10, 10B, 10C, 20 and 21, with amendments listed to 227(I)/2025); Town Planning and Spatial Planning Law 90/1972 (sections 21 and 28, amendments listed to 179(I)/2025); Sale of Immovable Property (Specific Performance) Law 81(I)/2011 (section 3, six-month deposit). Department of Lands and Surveys, Ministry of Interior: leaflet Basic Information before the Purchase of Immovable Property (PIO 179/2022); portal page Horizontal Division (conditions from 2 January 2024, documents and fees); Citizen's Charter (PIO 453/2011, published 2011). Gov.cy: Building Permits service page (Town Planning and Housing Department, forms A1 to A12); Statistical Service press release Building Permits: October 2025 (13 February 2026, with the transfer of permit issuing on 1 July 2024 and the figures cited). Point of Single Contact, Ministry of Energy, Commerce and Industry (businessincyprus.gov.cy): the Planning permission page and the Building permission page; Limassol District Local Government Organisation planning licensing page. Cyprus Mail: Cabinet approves new building permit regulations (reported 28 October 2026) and the guest column Finished homes without electricity (4 November 2026).
What conflicts or could not be confirmed. No official page read uses the phrase "final approval"; the statute and IPPODAMOS say certificate of approval. No official page gives a time for issuing the certificate of approval or the title deed other than the 2011 Citizen's Charter estimate. No amount was found for the planning fee, the building permit fee or the certificate fee, and the Land Registry fee page does not say who pays or whether the surveyor's charges are extra. The Electricity Authority site was not readable on 16 November 2026, so the rule on connection and the certificate is unconfirmed, and no official page read describes bank conditions for lending on a unit under construction. We found no official page confirming whether the public can look up a permit's status on IPPODAMOS. The sale-contract deposit, the 21-day duty, the cap years and the fees in the worked example are quoted from the texts above, while all dates, the payment split, the retention and the 24-unit block are assumptions. This guide is general information and not legal or tax advice; a licensed lawyer should confirm your own position. Cyprus VIP Estates assists investors in choosing new developments; legal and immigration advice comes from licensed professionals.